Frequently Asked Questions

Common questions about RAPTA equipment

The terms are often used for similar steel plates installed over trenches, excavations and temporary openings.

RAPTA uses Steel Road Plates as the primary product name. Construction Plates is an alternative term used by some customers and contractors.

The terminology does not determine whether a plate is suitable or compliant for a particular application. The plate and installation must be assessed against the relevant project and road-authority requirements.

The terms are often used for similar steel plates installed over trenches, excavations and temporary openings.

RAPTA uses Steel Road Plates as the primary product name. Construction Plates is an alternative term used by some customers and contractors.

The terminology does not determine whether a plate is suitable or compliant for a particular application. The plate and installation must be assessed against the relevant project and road-authority requirements.

Yes. Each plate includes six 30mm fixing holes.

The fixing holes allow the plate to be restrained or secured in accordance with the installation design and project requirements.

Yes, our products are proudly Australian made, welded by skilled technicians out of our warehouse in Gisborne, VIC. We ensure high-quality manufacturing standards and reliable performance to meet the needs of contractors across Australia.

Yes, our steel road plates are designed to support heavy machinery and vehicle loads. Whether you need temporary access for construction or maintenance, our equipment provides safe and durable solutions.

We offer product demonstrations on-site in Victoria to help you make an informed decision. Contact us to schedule a demo at your site and speak to a representative

We offer product demonstrations on-site in Victoria to help you make an informed decision. Contact us to schedule a demo at your site and speak to a representative

Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s, when an unknown printer took a galley

Yes, we offer exclusive rates for large orders or long-term projects. Contact us for more details and to discuss the best pricing options for your needs.

Not automatically.

Surface treatment is one consideration. Road-use requirements may also address dimensions, structural capacity, unsupported span, loading, support, restraint, traffic conditions, installation and inspection.

Suitability must be confirmed against the applicable road authority and project requirements.

The installed lifting point has a Working Load Limit of 5 tonnes.

The complete lifting method must still account for the lifting tool, lifting equipment, connection method, plate condition and applicable lifting procedures.

Yes. The lifting tool and weld-in receiver comply with AS 4991.

The patented dovetail lifting system reduces reliance on crowbars and the need to reach underneath road plates during handling.

Contact RAPTA with your site layout, expected loads and delivery location and we'll help match the system to your needs.

Ordering is easy through our website, or you can speak to our sales team to place your order directly. We’ll guide you through the process and ensure timely delivery to your location.

Unlike stick-built walkways that are cut and assembled on-site, RaptaCover™ is pre-engineered and flat-packed, meaning no on-site improvisation, less timber waste, fewer labour hours and reduced WHS exposure. It's designed for repeat deployment across multiple projects.

The system has a maximum pumping distance of 605m and a maximum pumping height of 12m, subject to the installation and site conditions.

The receiver is welded into the road plate and sits flush with the plate surface.

Each 6m × 3m module installs in approximately 18 minutes with an experienced crew, making it one of the fastest covered walkway systems available for site compounds.

Up to 432m² of covered walkway can be transported on a single semi-trailer, making logistics efficient for large or multi-site projects.

We deliver Australia-wide and offer affordable shipping rates. Contact our team for a freight quote tailored to your specific location and needs.

Place the steel road plate over the trench, align it correctly, and secure it with anchors to prevent movement. Always use lifting equipment for safe installation.

Yes. An optional yellow anti-slip coating is available.

The appropriate surface treatment should be confirmed against the intended application, traffic environment and relevant project requirements.

Yes. RaptaCover™ is designed to be reused across multiple projects. The flat-packed, stackable design makes it straightforward to pack down, transport and redeploy.

Yes. A 5 t WLL weld-in lifting point is installed in the road plate as standard.

No. The compatible heavy-duty road plate lifter is available separately.

Adding anti-slip coating increases safety, particularly in wet conditions. It’s a smart investment for both vehicle and pedestrian safety on high-traffic sites.

Hiring equipment is cost-effective for short-term or one-off projects. For long-term use, purchasing offers more value and convenience, with reliable equipment on hand.

RAPTA Steel Road Plates offer durability for heavy traffic, while plastic trench covers are lightweight and cost-effective for lighter applications. Choose based on project load and conditions.

Available accessories include flashing kits for weather sealing, infill walls for enclosed weather protection, balustrades for elevated sections, steel step integration, tie-down straps, and concrete blocks and fixing plates.

RaptaCover™ can be configured as a raised covered walkway or a roof-over. Both configurations use the same modular components, giving you flexibility across different compound layouts.

Every product ships with installation guides, engineering documentation (where applicable), and compliance packs to support site induction and planning workflows.

We provide equipment solutions for a range of industries including construction, infrastructure, utilities, and civil engineering. Our products are designed to meet the demands of both large and small projects.

The six 30mm fixing holes are used to secure or restrain the plate as required by the installation.

The 5 t WLL weld-in lifting point is used with a compatible lifting tool to handle the plate from above.

We offer fast delivery, with typical lead times ranging from a few days to a week, depending on availability. For urgent needs, contact our team to discuss expedited shipping options.


The lifting system has a Working Load Limit of 5 tonnes with a minimum 4:1 safety factor.

The system connects to standard 15A site power for straightforward plug-and-play installation.

The standard RAPTA Steel Road Plate is:

1200mm wide
2400mm long
25mm thick

Other sizes and thicknesses available.

We provide a wide range of high-quality construction equipment, including road plates, trench covers, and temporary access solutions designed to meet the needs of contractors across various industries.

Lorem Ipsumis simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s, when an unknown printer took a galley

CabinPump Ultra can transfer macerated wastewater directly to an available sewer main or to remote bulk storage.