RAPTA Rumble Grid 4x2m Engineered 18t Per Axle
RAPTA Rumble Grid 4x2m Engineered 18t Per Axle
Couldn't load pickup availability
KEEP MUD ON SITE.
STAY COMPLIANT WITH COUNCIL CONDITIONS.
The RAPTA Rumble Grid is a heavy-duty vehicle track-out control solution engineered to shake mud, soil and debris from tyres before vehicles leave construction and civil sites.
By helping reduce mud tracked onto public roads, the grid supports cleaner site exits, safer surrounding roads and compliance with council site conditions. Its robust Australian steel construction and zinc-rich protective coating make it a durable, reusable asset for demanding site environments.
Rated for 18 tonnes per axle, the 4 × 2 metre grid is suitable for heavy vehicles and site machinery. Four rated lifting points and integrated forklift pockets make it easier to position, relocate and remove as site access requirements change.
The grid can be installed in-ground where excavation is possible or paired with optional heavy-duty ramps for use on concrete, asphalt and other hard surfaces.
KEY BENEFITS:
- Helps remove mud and debris from vehicle tyres
- Reduces mud tracking onto public roads
- Supports compliance with council site conditions
- Heavy-duty design rated for 18 tonnes per axle
- Four rated lifting points for lifting and relocation
- Integrated forklift pockets for repositioning
- Reusable across construction and civil projects
- Zinc-rich coating for protection in demanding conditions
- Optional ramps for hard-surface installation
OVERVIEW:
| Specification | Details |
|---|---|
| Size | 4000mm × 2000mm × 250mm |
| Weight | 600kg |
| Load rating | 18 tonnes per axle |
| Material | Australian steel |
| Finish | Zinc-rich coating |
| Lifting points | 4 × 2t WLL |
| Handling | Rated lifting points and forklift pockets |
INSTALLED OPTIONS
Grid only
Best suited to sites where the grid can be recessed into the ground, allowing vehicles to drive directly across it.
Grid with heavy-duty ramps
Suitable for concrete, asphalt and other hard surfaces where excavation is not practical.
COMPLIANCE
Engineered to comply with:
- AS 5100.2:2017
- AS 4100:2020
- AS/NZS 1170.4:2007
- AS/NZS 1170.2:2021
- AS/NZS 1170.0:2002
